Skip to main content
UCRMaharashtra IndiaAMS-I.D

2 MW Small Scale Gunjawani Hydro Electric Project By M/s Ashoka Sathapatya Pvt. Ltd.

UCR-133 ↗

#7of 13 in Maharashtra India#243of 421 in Universal Carbon Registry (UCR)#316of 417 in AMS-I.D

3.2/ 10
Integrity
4.0
Transparency
1.5
Claim Safety
4.5
Documentation
2.0

Audit Analysis

This 2 MW small-scale hydro project in Maharashtra, India, relies on a single PDD document with no verification or monitoring reports in the record. The jurisdictional baseline and standard AMS-I.D. methodology provide a reasonable methodological foundation, but the complete absence of a verification body, additionality test, and verified emissions reductions figures leaves the 6,307 tCO2e claim unconfirmed. The project's integrity and transparency are significantly undermined by the thin evidentiary base.

Red Flags

  • No verification body is identified and no verification or monitoring report appears in the extracted record; the 6,307 tCO2e ERR figure is entirely unverified
  • No additionality test type is stated and no VVB confirmation of additionality is found in the available documents
  • Only a single PDD (dated 2022-03-31) is available, which post-dates the end of the crediting period (2021-12-31), raising questions about the documentation timeline
  • No buffer pool is established and no permanence risk mitigation mechanism is documented
  • FPIC and grievance mechanism are not documented despite safeguards being mentioned

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found

Permanence

No buffer pool; low inherent risk for hydro but unmitigated

Leakage

0% deemed negligible; reasonable for hydro but unquantified

Baseline

Jurisdictional baseline; grid EF from 2014; no reassessment

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents