Skip to main content
UCRMaharashtra India.AMS-I.D

7.2 MW small-scale bundled wind power project by M/s Shah Promoters and Developers

UCR-180 ↗

#653of 770 in Renewable energy#279of 421 in Universal Carbon Registry (UCR)#346of 417 in AMS-I.D

3.1/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
4.5
Documentation
2.5

Audit Analysis

A 7.2 MW wind power project in Maharashtra registered under UCR with a standard AMS-I.D methodology and a jurisdictional grid emission factor of 0.9 tCO₂/MWh. The available record consists solely of a PDD (June 2022), with no verification report, monitoring report, or VVB documentation, leaving additionality, permanence safeguards, and actual emission reductions unverified. The project design is low-risk in principle, but the documentation gap prevents meaningful quality assurance.

Red Flags

  • No verification report, monitoring report, or VVB report found in the available record — only a single PDD is on file
  • Additionality test type and VVB confirmation are not stated in the PDD, leaving the additionality claim unverified
  • Crediting period end date is not stated, making the project's temporal scope unclear
  • No buffer pool percentage or permanence safeguard mechanism is documented

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not stated in PDD; no VVB confirmation found

Permanence

No buffer pool documented; low inherent risk for wind but un

Leakage

0% deemed negligible — consistent with wind displacement

Baseline

Jurisdictional grid EF 0.9 appropriate; reassessment date no

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents