Skip to main content
UCRHimachal Pradesh IndiaAMS-I.D

500 kW Ground Mounted Solar Power Project By M/s Jamla Solar Power PV Project

UCR-148 ↗

#534of 770 in Renewable energy#8of 13 in Himachal Pradesh India#108of 421 in Universal Carbon Registry (UCR)#239of 417 in AMS-I.D

3.7/ 10
Integrity
4.5
Transparency
2.0
Claim Safety
5.0
Documentation
2.5

Audit Analysis

A 500 kW ground-mounted solar PV project in Himachal Pradesh registered under the UCR standard, assessed solely from its Project Design Document. The jurisdictional baseline and negligible-leakage treatment are appropriate for the project type, but the absence of a verification report, VVB identification, additionality test details, and any ERR figures leaves critical integrity and transparency questions unanswered.

Red Flags

  • No verification report or VVB identification found in the available record; additionality test type and VVB confirmation are not stated
  • Only a single document (PDD) is available; no monitoring report, verification report, or registry listing data to corroborate claims
  • Monitoring period (Jul–Dec 2021) predates the PDD date (Apr 2022), raising a sequencing question about project approval timeline

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; VVB confirmation absent

Permanence

Avoidance project; no reversal events reported

Leakage

0% deemed negligible; appropriate for solar PV

Baseline

Jurisdictional method; reassessment date not stated

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents