1 MW Jiwa Small Hydro Electric Project in Kullu District of Himachal Pradesh
#6of 13 in Himachal Pradesh India#94of 421 in Universal Carbon Registry (UCR)#228of 417 in AMS-I.D
Audit Analysis
A 1 MW small hydro project under the UCR registry with a jurisdictional baseline and smart-meter monitoring, but the available record consists solely of a PDD with no verification, monitoring, or VVB reports. Key integrity elements — additionality test type, VVB confirmation, buffer pool, and ERR figures — are absent from the extracted data, making a robust quality assessment impossible. The project's basic design (jurisdictional baseline, AMS-I.D methodology, grid EF of 0.9 tCO₂/MWh) is reasonable, but the documentation gap is severe.
Red Flags
- No verification body (VVB) is identified in any available document; additionality verification status is unknown
- No ERR figures (claimed or verified) are present, preventing any over- or under-delivery assessment
- Only a single PDD document is available; no verification report, monitoring report, or VVB audit report was found
- No buffer pool or permanence mechanism is documented for a project with a 2014–2022 crediting period
- Leakage deduction of 0% is justified only as 'deemed negligible' without quantified analysis
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not documented
No buffer pool or permanence mechanism stated
0% deduction, 'deemed negligible' only
Jurisdictional baseline, grid EF 0.9
Mentioned and benefit sharing described; FPIC and grievance
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →