Skip to main content
UCRMaharashtraAMS-I.D

12 MW Bhandardara Hydro Project in Maharashtra by DLHPPL.

UCR-525 ↗

#2of 421 in Universal Carbon Registry (UCR)#136of 416 in AMS-I.D

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

The 12 MW Bhandardara small hydro project uses a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of the PDD with no verification report, monitoring report, or named VVB. Additionality was not explicitly confirmed by an independent verifier in the extracted data, and no verified emission reduction figures are available to benchmark against the 37,155 tCO₂e lifetime claim. The project is structurally sound for a small hydro avoidance project but lacks the independent verification layer needed for high confidence.

Red Flags

  • No verification report or monitoring report is present in the evidence set despite a four-year monitoring period (2021–2024); only the PDD (dated Feb 2025) is available.
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality claim unverified by an independent body.
  • No VVB is named in the available documents, making it impossible to assess the independence and rigour of the verification process.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available docum

Permanence

Hydro avoidance project; no inherent reversal risk

Leakage

0% deduction, justified as negligible for hydro

Baseline

Jurisdictional method stated; reassessment timing not docume

Safeguards

FPIC and benefit sharing documented; grievance mechanism not

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents