Skip to main content
UCRGujarat IndiaAMS-I.D

1.26 MW Ground Mounted Solar Power Project By M/S Sheetal Cool Products Ltd

UCR-166 ↗

#583of 770 in Renewable energy#24of 42 in Gujarat India#191of 421 in Universal Carbon Registry (UCR)#287of 417 in AMS-I.D

3.3/ 10
Integrity
3.5
Transparency
2.0
Claim Safety
5.0
Documentation
2.5

Audit Analysis

A small 1.26 MW ground-mounted solar project in Gujarat registered under the UCR standard, assessed solely from its Project Design Document. The jurisdictional baseline and negligible-leakage treatment are appropriate for the technology, but the complete absence of a verification body, additionality evidence, ERR figures, and any monitoring or verification reports leaves critical integrity and transparency questions unanswered.

Red Flags

  • No verification body (VVB) is identified in the available record, and no verification or monitoring reports were found — the project's additionality, baseline, and emissions reductions have not been independently confirmed in the extracted documents.
  • Neither claimed nor verified emissions reductions are stated, making it impossible to assess whether the project is over- or under-crediting.
  • No buffer pool or permanence mechanism is documented, and no additionality test type or VVB confirmation is recorded.

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB confirmation found

Permanence

No buffer pool; no reversal events reported

Leakage

0% deemed negligible — appropriate for solar

Baseline

Jurisdictional; 2014 grid EF; reassessment timing not stated

Safeguards

Safeguards and benefit sharing mentioned; no FPIC or grievan

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents