Skip to main content
UCRGujarat IndiaAMS-I.D

4 MW Ground Mounted Solar Power Project By M/S Ikaa Granito Pvt. Ltd.

UCR-157 ↗

#423of 770 in Renewable energy#1of 42 in Gujarat India#3of 421 in Universal Carbon Registry (UCR)#147of 417 in AMS-I.D

4.5/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
6.0
Documentation
3.5

Audit Analysis

A 4 MW ground-mounted solar project in Gujarat, India, registered under the UCR standard using the well-established AMS-I.D. methodology. The project design is inherently low-risk (jurisdictional baseline, avoidance-type credits, negligible leakage), but the available record consists solely of a PDD with no verification report, monitoring report, or identified VVB, leaving additionality confirmation and actual credit delivery unverified.

Red Flags

  • No VVB is identified in the available documents; additionality verification cannot be confirmed
  • Only a single PDD is on file — no verification report, monitoring report, or VVB audit report was found
  • Additionality test type is not stated in the extracted record, leaving the additionality claim unconfirmed
  • Crediting period spans only ~16 months (Aug 2020 – Dec 2021), unusually short for a solar PV project and raising questions about the project's scale and longevity

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation found

Permanence

Avoidance-type solar; no reversal risk

Leakage

0% deemed negligible; appropriate for solar PV

Baseline

Jurisdictional baseline; grid EF 0.9 (2014)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated; risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents