28.7MW Biomass based Power Generation by M/s CBKSSKN, Chikkodi by Energy Advisory Services
#123of 196 in Biomass#5of 17 in Karnataka India#102of 421 in Universal Carbon Registry (UCR)#233of 417 in AMS-I.D
Audit Analysis
This 28.7 MW bagasse-based cogeneration project in Karnataka uses a jurisdictional baseline and reports no material findings or corrective actions, which are positive signals. However, the extracted record contains only a single PDD document with no verification or monitoring reports, no identified VVB, and no verified emission reduction figures, leaving substantial evidence gaps across additionality, permanence, and MRV. The 0% leakage deduction is reasonable for a biomass power project but is supported only by a brief 'deemed negligible' note.
Red Flags
- No verification report or monitoring report is present in the extracted record; only a PDD (dated 2023-04-25) was used, leaving additionality, MRV, and verified ERR figures entirely unconfirmed
- No VVB is identified and no additionality test type is stated in the available data, making it impossible to confirm that additionality was independently verified
- No verified emission reduction figures are available to cross-check against the 486,000 tCO2e claimed over the 2013–2021 crediting period
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; no VVB confirmation found
No buffer pool or reversal data; risk unaddressed
0% deemed negligible; justification thin but plausible for b
Jurisdictional baseline used; reassessment timing not stated
Safeguards mentioned; FPIC and grievance mechanism not detai
CORSIA and CCP status both unstated; risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →