3.99 MW Hybrid Project by Shreeji Coke and Energy Pvt. Ltd.
#11of 42 in Gujarat India#81of 421 in Universal Carbon Registry (UCR)#217of 417 in AMS-I.D
Audit Analysis
A 3.99 MW hybrid renewable energy project in Gujarat, India, registered under UCR using the AMS-I.D. methodology. The project relies on a jurisdictional baseline and smart-meter monitoring, but the available record consists solely of the PDD, with no verification report, monitoring data, or named VVB to corroborate additionality or validate the claimed 6,291 tCO₂e. The thin evidentiary base limits confidence in both the integrity and transparency of the credit claims.
Red Flags
- No VVB is named and no additionality test type is recorded in the available documents, leaving the additionality claim unverified by any third party in the extracted record.
- Only a single document (the PDD dated 2024-12-30) was used; no verification report, monitoring report, or audit report is present, so the claimed 6,291 tCO₂e has no independent verification.
- Buffer pool percentage is not stated, leaving permanence risk unquantified even though the project type (renewable energy) carries lower inherent reversal risk.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Required by AMS-I.D. but test type and VVB confirmation not
Low inherent risk (RE) but no buffer pool stated
0% deemed negligible, consistent with RE displacement
Jurisdictional baseline; reassessment timing not stated
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →