2.5 MW Small Scale Gosikhurd (RBC) Hydro Electric Project by M/s Aarti Hydro Power Pvt. Ltd.
#547of 770 in Renewable energy#5of 13 in Maharashtra India#123of 421 in Universal Carbon Registry (UCR)#252of 417 in AMS-I.D
Audit Analysis
A 2.5 MW small-scale run-of-river hydro project in Maharashtra using a jurisdictional grid baseline (0.9 tCO₂/MWh, 2014) and the AMS-I.D. methodology. The project type carries inherently low permanence and leakage risk, but the available record consists solely of the PDD — no verification report, monitoring report, or VVB documentation was found, leaving additionality confirmation, verified emissions reductions, and safeguards implementation unconfirmed.
Red Flags
- No verification body (VVB) identified in the available record; additionality test type and VVB confirmation are absent
- No monitoring report or verified ERR figure available — the 7,884 tCO₂e claim is unverified
- Only one document (PDD) in the evidence base; no verification, monitoring, or VVB reports present
- FPIC and grievance mechanism status not confirmed in available documents
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Methodology requires it; no VVB-confirmed test type found
Low inherent risk (hydro); no buffer pool recorded
0% deemed negligible — reasonable for grid-displacing hydro
Jurisdictional, 2014 grid EF; no reassessment date stated
Mentioned and benefit sharing described; FPIC and grievance
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →