2.5 MW Small Scale Gosikhurd (RBC) Hydro Electric Project by M/s Aarti Hydro Power Pvt. Ltd.

UCR-131 ↗

#547of 770 in Renewable energy#5of 13 in Maharashtra India#123of 421 in Universal Carbon Registry (UCR)#252of 417 in AMS-I.D

3.6/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
5.5
Documentation
2.0

Audit Analysis

A 2.5 MW small-scale run-of-river hydro project in Maharashtra using a jurisdictional grid baseline (0.9 tCO₂/MWh, 2014) and the AMS-I.D. methodology. The project type carries inherently low permanence and leakage risk, but the available record consists solely of the PDD — no verification report, monitoring report, or VVB documentation was found, leaving additionality confirmation, verified emissions reductions, and safeguards implementation unconfirmed.

Red Flags

  • No verification body (VVB) identified in the available record; additionality test type and VVB confirmation are absent
  • No monitoring report or verified ERR figure available — the 7,884 tCO₂e claim is unverified
  • Only one document (PDD) in the evidence base; no verification, monitoring, or VVB reports present
  • FPIC and grievance mechanism status not confirmed in available documents

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Methodology requires it; no VVB-confirmed test type found

Permanence

Low inherent risk (hydro); no buffer pool recorded

Leakage

0% deemed negligible — reasonable for grid-displacing hydro

Baseline

Jurisdictional, 2014 grid EF; no reassessment date stated

Safeguards

Mentioned and benefit sharing described; FPIC and grievance

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents