Skip to main content
UCRChittar Taluk: Rani District Pathanamthitta KeralaAMS-I.D

7 MW Ullumkal Small Hydro Power Project at EDCL Power Projects Ltd by EASPL

UCR-427 ↗

#446of 770 in Renewable energy#9of 421 in Universal Carbon Registry (UCR)#157of 416 in AMS-I.D

4.3/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
6.0
Documentation
3.5

Audit Analysis

A 7 MW small hydro project in Kerala, India, using the well-established AMS-I.D methodology with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO2/MWh. The project's core design appears sound for a hydro displacement project, but the available documentation is limited to a single PDD with no verification reports, monitoring reports, or identified VVB, leaving additionality verification and actual performance unconfirmed.

Red Flags

  • No verification body (VVB) is identified in the available records, and no verification or monitoring reports were found — the project's additionality and actual emissions reductions remain unverified in the extracted documentation
  • Additionality test type and VVB confirmation are not stated in the PDD, leaving the core additionality claim unsupported by the available evidence
  • Only one document (the PDD) is available; the absence of any monitoring or verification report for a project whose full 10-year crediting period (2013–2023) has elapsed is a significant transparency gap

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Methodology requires it but test type and VVB confirmation n

Permanence

Hydro infrastructure is long-lived; no reversal events repor

Leakage

Deemed negligible — appropriate for grid-displacement hydro

Baseline

Jurisdictional baseline present; reassessment timing not sta

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not detai

Double-claim

CORSIA and CCP status not stated in available records

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents