800 KW Wind Power Project By M/s Plasma Alloys Pvt. Ltd
#554of 770 in Renewable energy#18of 42 in Gujarat India#133of 421 in Universal Carbon Registry (UCR)#258of 417 in AMS-I.D
Audit Analysis
An 800 kW wind power project in Gujarat registered under the UCR standard with a jurisdictional baseline and a conservative lifetime ERR claim of 1,576 tCO₂e. The project design appears methodologically sound (AMS-I.D v18, smart-meter monitoring, negligible leakage), but the available record consists solely of the PDD — no verification report, monitoring report, or VVB assessment was found, leaving additionality, permanence, and actual delivery unconfirmed.
Red Flags
- No verification body (VVB) is identified in the extracted record; additionality test type and VVB confirmation are both absent, so the additionality claim rests solely on the PDD narrative.
- Only one document (the PDD, dated 2023-03-14) was available; no monitoring report, verification report, or VVB report was found despite the project having been operational since September 2015.
- CORSIA eligibility and CCP status are both unstated, leaving the project's eligibility for international markets and the risk of dual-channel crediting unassessed.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not found in record
Physical wind asset; no reversal events reported
0% deduction, deemed negligible – appropriate for grid-conne
Jurisdictional method used; reassessment date not stated
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →