8.8 MW Small Scale Wind Energy Project by Engineered Power Resources India (P) Ltd

UCR-184 ↗

#655of 770 in Renewable energy#3of 7 in Tamil Nadu#282of 421 in Universal Carbon Registry (UCR)#348of 417 in AMS-I.D

3.1/ 10
Integrity
4.0
Transparency
1.5
Claim Safety
4.0
Documentation
2.0

Audit Analysis

An 8.8 MW wind energy project in Tamil Nadu registered under the UCR standard using the well-known AMS I.D. methodology with a jurisdictional baseline. The project type carries inherently low permanence risk, but the available record consists solely of a PDD with no verification report, monitoring data, or VVB documentation, leaving additionality, leakage, and claim verification entirely unconfirmed.

Red Flags

  • Only a PDD is available in the extracted record; no verification report, monitoring report, or VVB documentation was found, leaving additionality and ERR verification unconfirmed
  • No leakage treatment (deduction or justification) is stated in the available documents
  • No verified ERR figures exist to validate the 15,033 tCO2e claimed over the 8-year crediting period
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available recor

Permanence

Wind generation – no inherent reversal risk

Leakage

No deduction or justification found in the record

Baseline

Jurisdictional method stated; reassessment timing not docume

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS I.D.: “Grid connected renewable electricity generation”

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents