Skip to main content
UCRGujarat India.AMS-I.D

2.6 MW Small Scale Wind Power Project by M/s Silvertech Fibers Private Limited

UCR-213 ↗

#489of 770 in Renewable energy#4of 33 in Gujarat India.#46of 421 in Universal Carbon Registry (UCR)#190of 417 in AMS-I.D

4.0/ 10
Integrity
4.5
Transparency
3.0
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 2.6 MW wind power project in Gujarat, India, registered under the UCR standard using the well-established AMS-I.D methodology with a jurisdictional baseline. The project shows no material findings or corrective actions, but the available record consists solely of a PDD with no verification report, monitoring data, or identified verification body, leaving critical claims unverified.

Red Flags

  • No verification body (VVB) is identified in the available record, and no verification report or monitoring report is present — the project's claims rest entirely on the PDD
  • No ERR figures (claimed or verified) are available, making it impossible to assess whether the project is delivering on its stated credit volume
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unconfirmed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; VVB confirmation absent

Permanence

Low inherent risk (wind) but no buffer pool specified

Leakage

0% deduction, deemed negligible — appropriate for wind

Baseline

Jurisdictional method used; reassessment date not stated

Safeguards

Mentioned in PDD; FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents