Skip to main content
UCRMaharashtra IndiaAMS-I.D

1.25 MW Wind Power Project at Dhule

UCR-357 ↗

#542of 770 in Renewable energy#4of 13 in Maharashtra India#116of 421 in Universal Carbon Registry (UCR)#244of 417 in AMS-I.D

3.6/ 10
Integrity
4.2
Transparency
2.0
Claim Safety
4.8
Documentation
2.8

Audit Analysis

A small 1.25 MW wind project in Maharashtra with a jurisdictional baseline and a conservative ex-ante claim of 1,971 tCO2e over 13 years. The record is limited to a single PDD with no verification report, monitoring data, or identified VVB, leaving additionality, actual performance, and safeguards largely unconfirmed. The project type carries inherently low reversal and leakage risk, but the absence of any third-party verification or monitoring evidence significantly weakens confidence in the credit.

Red Flags

  • No verification body (VVB) is identified in the available record; additionality and ERR verification status are unknown
  • No verified ERR or monitoring data exists — only the ex-ante claim of 1,971 tCO2e is available
  • Only a single PDD document is in the record; no verification report, monitoring report, or VVB audit report was found
  • No buffer pool or permanence protection mechanism is documented for the 13-year crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not stated in available docum

Permanence

No buffer pool documented; low inherent reversal risk for wi

Leakage

0% deduction, deemed negligible — reasonable for grid-connec

Baseline

Jurisdictional baseline (grid EF 0.9, 2013); no reassessment

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP eligibility not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents