Skip to main content
UCRTamil NaduGeneral Methodologyv2.0

2.425 MW Bundled Wind Power Project in Tamil Nadu

UCR-391 ↗

#716of 770 in Renewable energy#5of 7 in Tamil Nadu#381of 421 in Universal Carbon Registry (UCR)

2.7/ 10
Integrity
2.5
Transparency
1.5
Claim Safety
4.5
Documentation
2.0

Audit Analysis

This 2.425 MW wind project in Tamil Nadu is registered under the UCR standard with a claimed 5,340 tCO₂e over a 10-year crediting period, but the evidentiary record is extremely thin — only a single PDD (dated after the crediting period ended) was available, with no verification report, monitoring report, or identified verification body. Additionality is neither tested nor verified, the baseline is project-specific with no reassessment date, and no buffer pool or permanence mechanism is documented. The claimed ERR appears conservative relative to the installed capacity, but the absence of any verified monitoring data makes it impossible to confirm actual delivery.

Red Flags

  • No verification body (VVB) is identified in any available document; additionality is neither tested nor independently verified
  • The PDD is dated 27 October 2023, which is after the crediting period end of 31 December 2022, raising questions about whether the project documentation was prepared retroactively
  • No buffer pool or permanence mechanism is documented, and no reversal events are confirmed absent (field is empty rather than explicitly zero)
  • Only one document (the PDD) was available; no verification report, monitoring report, or VVB audit report could be located

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No test or VVB verification found

Permanence

No buffer pool; reversals unconfirmed

Leakage

0% deemed negligible, consistent with wind

Baseline

Project-specific, no reassessment date

Safeguards

Mentioned but FPIC and grievance unconfirmed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19General Methodology v2.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents