3.30 MW Small Scale Hydro Power project by Nanal Hydro Power Consultancy Pvt. Ltd.

UCR-52 ↗

#492of 770 in Renewable energy#5of 6 in Chamba Himachal Pradesh India#48of 421 in Universal Carbon Registry (UCR)#191of 417 in AMS-I.D

4.0/ 10
Integrity
4.0
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 3.30 MW small-scale hydro project in Himachal Pradesh, India, registered under the UCR using the well-established AMS-I.D methodology. The project benefits from a jurisdictional baseline, FPIC, and a reasonable 0% leakage treatment, but the documentation base is limited to a single PDD with no verification or monitoring reports, no identified VVB, and no additionality test documented. Overall, the project concept is sound but the evidentiary record is thin.

Red Flags

  • No additionality test type or VVB verification of additionality is stated in the available PDD
  • No verification report or monitoring report is present in the extracted record — only a single PDD (dated 2021-12-22) is available
  • No VVB is identified, and no crediting period is stated, making it impossible to assess the full project lifecycle
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB verification recorded

Permanence

Avoidance project; no reversal risk inherent to hydro

Leakage

0% deduction justified as negligible; consistent with grid-f

Baseline

Jurisdictional baseline present; no reassessment date or cre

Safeguards

FPIC conducted; safeguards explicitly mentioned in PDD

Double-claim

CORSIA and CCP statuses both unstated; dual-channel risk una

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents