A 1.4 MW ground-mounted solar project in Himachal Pradesh registered under the UCR standard using the AMS-I.D. methodology. The project benefits from a jurisdictional baseline and a reasonable zero-leakage justification, but the available record consists solely of the PDD — no verification report, monitoring report, or VVB identification is present, leaving additionality, permanence safeguards, and all ERR figures unconfirmed.

Red Flags

  • No VVB name or verification report found in the available record; additionality test type and VVB confirmation are not documented
  • No ERR figures (claimed or verified) are present in the extracted data, making over-crediting assessment impossible
  • CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
  • Crediting period is not stated in the available documents

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not documented in available r

Permanence

Solar avoidance project; no inherent reversal risk

Leakage

Zero deduction justified as negligible for grid-connected so

Baseline

Jurisdictional method appropriate; last reassessment date no

Safeguards

FPIC and benefit sharing documented; grievance mechanism not

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unass

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents