Skip to main content
UCRGujarat India.AMS-I.D

2.1 MW Small Scale Wind Power Project by M/s NRV Yarns Private Limited

UCR-200 ↗

#623of 770 in Renewable energy#18of 33 in Gujarat India.#245of 421 in Universal Carbon Registry (UCR)#318of 417 in AMS-I.D

3.2/ 10
Integrity
3.5
Transparency
1.5
Claim Safety
5.0
Documentation
2.5

Audit Analysis

A small-scale (2.1 MW) wind power project in Gujarat, India, using a jurisdictional baseline and a recognised methodology (AMS-I.D v18). The project design is broadly sound for a wind avoidance project, but the available record consists of a single PDD with no verification report, no monitoring report, and no named VVB, leaving additionality, verified emissions reductions, and third-party oversight entirely unconfirmed.

Red Flags

  • No additionality test type or VVB verification is stated in the available PDD, leaving the core additionality claim unverified
  • Only one document (the PDD) is in the record; no verification report, monitoring report, or VVB identification is present
  • The monitoring period (June–December 2021) predates the PDD date (July 2022), raising questions about the sequencing and completeness of the project documentation
  • No verified ERR figure is available to validate the 3,311 tCO₂ claimed, and no FNRB or usage-monitoring method is described

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type not stated; no VVB confirmation in record

Permanence

Avoidance project; no reversal risk identified

Leakage

0 % deduction, standard for wind displacement

Baseline

Jurisdictional baseline; reassessment date not stated

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not detai

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents