A 12 MW wind project in Maharashtra registered under UCR with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists of a single PDD dated after the crediting period ended, with no verification report, no monitoring data, and no documented additionality assessment. The absence of a VVB, verified emissions reductions, and any post-issuance monitoring makes it impossible to confirm that the claimed 18,922 tCO₂e were actually delivered or that additionality was properly established.
Red Flags
- The PDD is dated 30 May 2022, which is after the crediting period ended on 31 December 2021 — a PDD should precede or coincide with the start of the crediting period, raising questions about whether credits were issued before the project document was finalised.
- No additionality test type or VVB verification of additionality is found in the available record, despite AMS-I.D requiring an additionality assessment.
- No verification report, monitoring report, or VVB report is present in the extracted record; the only document is the PDD.
- The claimed total of 18,922 tCO₂e over 8 years for a 12 MW wind turbine appears very low relative to a simple capacity-factor estimate (≈227,000 tCO₂e at 30% CF and 0.9 tCO₂/MWh), and no monitoring data is available to explain the discrepancy.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test or VVB confirmation found
No buffer pool stated; reversal risk unaddressed
0% deemed negligible — reasonable for wind
Jurisdictional baseline, but no reassessment date stated
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →