5 MW Small Scale Hydro power project by M/s Regent Energy Limited.
#494of 770 in Renewable energy#51of 421 in Universal Carbon Registry (UCR)#193of 417 in AMS-I.D
Audit Analysis
A 5 MW small-scale hydro project in Himachal Pradesh registered under the UCR standard with a jurisdictional baseline and smart-meter monitoring. The project presents low inherent risk (hydro generation, negligible leakage, no reversal events), but the available record consists solely of a PDD with no verification or monitoring reports, no stated additionality test, and no quantified emission reduction figures, leaving significant evidence gaps.
Red Flags
- No additionality test type or independent verification is stated in the available PDD; the basis for additionality claims is undocumented
- No verification report, monitoring report, or VVB/verification body report is present in the extracted record — only a single PDD is available
- No emission reduction figures (claimed or verified) are available, making it impossible to assess over- or under-crediting
- The PDD is dated 3 August 2022, after the crediting period ended on 31 December 2021, raising questions about the registration timeline
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and verification not stated in PDD
Hydro generation project; no reversal risk
0% deemed negligible; consistent with hydro
Jurisdictional baseline stated; reassessment timing not docu
FPIC and safeguards mentioned; grievance mechanism not state
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →