2.45 MW Bundled Small Scale Wind Power Project at Rajasthan

UCR-316 ↗

#558of 770 in Renewable energy#150of 421 in Universal Carbon Registry (UCR)#264of 417 in AMS-I.D

3.5/ 10
Integrity
4.5
Transparency
1.5
Claim Safety
5.0
Documentation
2.0

Audit Analysis

A small-scale wind avoidance project under the UCR registry with a sound jurisdictional baseline and reasonable leakage treatment, but critically lacking in verification evidence: no VVB report, no monitoring reports, and no verified emission reduction figures are available. The sole document on file is a PDD dated after the crediting period ended, raising questions about the project's documentation trail.

Red Flags

  • Only one document (the PDD) is available; no verification report, monitoring report, or VVB report was found in the extracted record
  • The PDD is dated 1 March 2023, which is after the crediting period ended on 31 December 2022 — a PDD should precede project implementation
  • No verified or claimed emission reduction figures are available, making it impossible to confirm the project actually delivered its claimed reductions
  • No VVB name or additionality verification is recorded, leaving the additionality claim unconfirmed by an independent body

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not independently verified

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for wind

Baseline

Jurisdictional, no reassessment date

Safeguards

Mentioned but FPIC/grievance unconfirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.: Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents