3 MW Small Scale Hydro Power project by M/S Continental Intra-Tech Pvt. Ltd.
#530of 770 in Renewable energy#5of 7 in Kullu Himachal Pradesh India#103of 421 in Universal Carbon Registry (UCR)#234of 417 in AMS-I.D
Audit Analysis
A 3 MW small hydro project in Himachal Pradesh, India, registered under the UCR using the AMS-I.D methodology, with a jurisdictional baseline and a grid emission factor of 0.9 tCO₂/MWh. The project design appears methodologically sound for a hydro avoidance project, but the available record consists solely of the PDD — no verification report, monitoring report, or VVB identification is present, leaving additionality confirmation, verified emissions reductions, and MRV quality entirely unassessed.
Red Flags
- Only the PDD is available; no verification report, monitoring report, or VVB identification exists in the extracted record, making it impossible to confirm additionality, verify ERR figures, or assess MRV quality.
- Additionality test type and VVB verification status are not stated in the extracted data, despite being mandatory under the AMS-I.D methodology.
- No claimed or verified emissions reduction figures are available, preventing any assessment of over- or under-crediting.
- Buffer pool percentage is not stated, leaving permanence risk for the avoidance-based credits unquantified.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB verification not stated in extracted PDD d
Avoidance project; no carbon stock reversal risk; buffer poo
0% deduction, deemed negligible — appropriate for hydro
Jurisdictional method with 0.9 tCO₂/MWh; last reassessment n
FPIC conducted; safeguards mentioned in PDD
CORSIA and CCP eligibility status not stated in available do
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →