2.6 MW Small Scale Wind Power Project by M/s Dhruv Cotton Processing Private Limited
#548of 770 in Renewable energy#9of 33 in Gujarat India.#125of 421 in Universal Carbon Registry (UCR)#254of 417 in AMS-I.D
Audit Analysis
A 2.6 MW small-scale wind project in Gujarat registered on the UCR registry, with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO₂/MWh. However, the available record consists solely of a PDD — no verification report, monitoring report, or VVB documentation was found, leaving additionality, verified emissions, and independent oversight entirely unconfirmed. The project type carries inherently lower permanence and leakage risk, but the absence of any third-party verification is a material gap.
Red Flags
- No verification body is identified in the available record; additionality and emissions have not been independently confirmed
- Only a single document (the PDD, dated 2022-07-21) is available — no verification report, monitoring report, or VVB report was found
- Additionality test type is not stated in the extracted record, and no VVB confirmation of additionality is present
- CORSIA eligibility and CCP status are both unconfirmed, leaving dual-channel or over-crediting risk unassessed
- The claimed ERR of 4,100 tCO₂e is ambiguous in basis (annual vs. 7-year total) and appears low for a 2.6 MW turbine over the full crediting period, raising questions about the estimation methodology
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; no VVB confirmation found
Wind project; no reversal events; low inherent risk
0% deduction justified as negligible; consistent with wind
Jurisdictional method stated; no reassessment date or VVB co
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both unconfirmed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →