1.5 MW Small Scale Hydro Power project by M/S Saini Techno-Construct Pvt. Ltd, Himachal Pradesh
#480of 770 in Renewable energy#3of 6 in Chamba Himachal Pradesh India#38of 421 in Universal Carbon Registry (UCR)#183of 417 in AMS-I.D
Audit Analysis
A 1.5 MW small-scale hydro project in Himachal Pradesh registered under the UN Carbon Registry (UCR-76) using the AMS-I.D methodology. The project design is sound in principle — jurisdictional baseline, reasonable grid emission factor, and a low-reversal-risk technology — but the available record consists of only the PDD, with no verification reports, monitoring reports, or quantified emission reduction figures, leaving the project's actual performance and additionality unconfirmed in the extracted data.
Red Flags
- No verification or monitoring reports are present in the extracted record; only the PDD (dated 2022-01-17) was used, so actual emission reductions and compliance with the methodology cannot be independently confirmed.
- The PDD date (17 January 2022) post-dates the end of the crediting period (31 December 2021), which is unusual and may indicate a late registration, a document revision, or a data-extraction anomaly that warrants clarification.
- Additionality test type and verification status are not stated in the extracted record, leaving a gap in confirming that the project met the AMS-I.D additionality criteria (investment test, regulatory barrier, etc.).
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and verification not stated in extracted record
Hydro infrastructure; no reversal events reported
0% deduction, deemed negligible — consistent with small hydr
Jurisdictional method (good) but reassessment timing not sta
FPIC conducted and safeguards mentioned; grievance mechanism
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →