1.65 MW Wind Power Project in Gujarat
Score Breakdown
Integrity
verified The validation report from TÜV NORD CERT GmbH confirms additionality through an investment test.
missing Leakage justification is not addressed in the validation report, and buffer pool coverage is not stated in the available documents.
Transparency
verified The project has a named VVB and a defined monitoring and crediting period from 2011-08-16 to 2021-08-15.
missing Verified and claimed emission reduction totals are not stated in the extracted record, and key MRV details such as usage monitoring and grid factor inputs are missing.
Claim Safety
verified The project is a wind CDM activity using AMS I.D, which generally has a straightforward baseline structure.
missing Leakage and reversal treatment are unclear, and CORSIA eligibility and CCP status are not stated, leaving residual over-claiming risk.
Documentation
verified The record includes a validation report, a named verifier, and a moderate extraction confidence level.
missing Only one clearly identified official document is reflected in the extracted facts, and several important fields are not found in the available documents.
Detailed Analysis
Integrity
The validation report from TÜV NORD CERT GmbH confirms additionality using an investment test, which is a positive sign for project integrity. The baseline is project-specific under AMS I.D, but the extracted record does not state when the baseline was last reassessed, and buffer pool coverage is not found. Leakage justification is not addressed in the validation report, and reversal events are also not addressed, so permanence and leakage robustness remain only partially supported.
Transparency
Transparency is limited by missing MRV outputs and methodological detail in the extracted record. The monitoring and crediting period are clearly stated, and the VVB is identified, but verified and claimed emission reduction totals are not available in the extracted facts. Usage monitoring, grid emission factor inputs, and other public-facing MRV specifics are also not found, which weakens auditability.
Claim Safety
Claim safety is moderate but not strong because the project type is relatively simple while several risk controls are missing from the extracted record. The project uses a project baseline under AMS I.D, but leakage treatment is unclear and reversal handling is not documented. CORSIA eligibility and CCP status are not stated, so dual-claim risk cannot be ruled out from the available evidence.
Documentation
Documentation quality is mixed: the record includes a validation report, a named verifier, and eight extracted facts, but the extraction confidence is only medium. Several key fields are missing, including buffer pool, leakage deduction, verified emissions, and safeguard documentation. The contradictions suggest that later material may be more informative on leakage and reversals, but the available record does not provide enough detail to fully resolve them.
Overall
Overall, this project scores in the middle range because it has a credible CDM validation basis and VVB-confirmed additionality, but important risk and MRV details are missing. I privileged the validation report for additionality and baseline information because it is the clearest official source in the extracted record, while the later contradictory references suggesting no reversals and negligible leakage were not directly available and therefore were treated cautiously. The contradictions lower confidence because they indicate that different documents may not be aligned on key risk treatments.
Audit Analysis
This is a CDM wind project with VVB-confirmed additionality and a project-specific baseline, which supports moderate integrity. However, key MRV and risk details are missing or not addressed in the extracted record, and the contradictions around reversal events and leakage justification reduce confidence in the documentation and claim safety.
Project Description
Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 3.125 ktCO2e/yr
Red Flags
- Leakage treatment is not addressed in the validation report, and the record also contains a contradiction with a later source suggesting leakage was deemed negligible.
- Reversal risk is not addressed in the validation report, with a contradiction against a later source indicating no reversals were reported.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 19,924 | 0 | 19,924 | |
| Total | 19,924 | 0 | 19,924 |
Cosa migliorerebbe questo punteggio
- Provide the verification or monitoring documents that explicitly state leakage treatment, reversal status, and any buffer or risk mitigation provisions.
- Publish verified emission reduction totals, monitoring methodology details, and clear statements on CORSIA eligibility and CCP status.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
reversal risk not addressed
leakage not addressed
project baseline stated, reassessment missing
no safeguards evidence found
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →