10 MW Biomass Based Renewable Energy Generation for the Grid at Saradambika Power Plant Private Limited at Chandrapur District, Maharashtra
#31of 196 in Biomass#146of 387 in India#50of 213 in CDM (UNFCCC)#70of 417 in AMS-I.D
Audit Analysis
A 10 MW biomass power plant in Maharashtra, India, registered under CDM with a jurisdictional grid baseline and VVB-confirmed combined additionality test. The project delivered approximately 75% of its pro-rata ex-ante expectation for the first monitoring period, which is conservative. However, 14 material findings and 12 corrective actions at validation, combined with a 0% leakage deduction despite flagged biomass-competition concerns, moderate the overall quality.
Red Flags
- 14 material findings at validation (including boiler capacity change, substation relocation, and unverified additionality barriers) indicate the project design required substantial revision before issuance
- Leakage deduction of 0% despite the validation report explicitly flagging the need to 'demonstrate surplus biomass availability' and the monitoring report listing 'leakage due to biomass competition needed demonstration' as a material finding
- Grid emission factor of 814 gCO2/kWh is sourced from 2006 data; no evidence of periodic grid EF updates across the 10-year crediting period was found in the extracted record
- Feedstock sustainability, carbon content testing, and LCA are all absent from the available documentation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 30,781 | 0 | 30,781 | |
| Total | 30,781 | 0 | 30,781 |
Risk Indicators
Combined test, VVB-confirmed (DNV)
Avoidance project, no reversal risk
0% deduction, biomass competition flagged
Jurisdictional grid EF, standardised method
Mentioned but FPIC/grievance not documented
CORSIA/CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →