Audit Analysis
A 10 MW solar PV project in Gujarat using the standardised AMS-I.D. methodology with a jurisdictional baseline, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB documentation. Additionality verification, verified emissions reductions, and CORSIA/CCP eligibility are all unconfirmed, leaving significant evidence gaps that limit confidence in the project's integrity and claim safety.
Red Flags
- No verification report or VVB report is present in the record; additionality test type and independent verification are entirely undocumented
- No monitoring report or verified ERR figure is available; the only ERR data point is the ex-ante claim of 15,768 tCO₂e
- CORSIA eligibility and CCP approval status are both unstated, leaving dual-channel or double-claiming risk unassessed
- Only a single PDD (dated 2021-12-08) is available; no post-issuance monitoring or verification documents exist in the extracted record
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Standardised methodology but test type and VVB verification
Solar PV – no inherent reversal risk
0% deemed negligible – reasonable but justification is minim
Jurisdictional baseline, grid EF 0.9 (2014); no reassessment
Safeguards mentioned; FPIC and grievance mechanism not docum
CORSIA and CCP status both unstated – dual-channel risk unas
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →