10 MW wind power project by Powerica at BDS - Gujarat
Score Breakdown
Integrity
verified Additionality was tested using an investment test and was confirmed by the VVB in the monitoring record.
missing Leakage is marked as not addressed in the latest monitoring facts, and no leakage deduction is stated.
Transparency
verified The project has a named VVB, a defined 2022 monitoring period, and claimed and verified ER totals are both stated in the record.
missing The record does not state a usage monitoring method, and the ER figures are inconsistent across documents.
Claim Safety
verified The project is a renewable-energy wind project under VCS, which is generally lower risk than many crediting categories.
missing The baseline is project-specific rather than a more conservative standardized baseline, and leakage treatment is weakly documented.
Documentation
verified Nineteen documents were used, and extraction confidence is high.
missing A corrective action notes inconsistency between the content page and the VCS monitoring report, indicating documentation quality issues.
Detailed Analysis
Integrity
The monitoring report dated 2023-07-18 confirms additionality through an investment test and says the VVB found no material findings. That supports the project’s core integrity, but the latest facts do not state any leakage deduction and mark leakage as not addressed, which is a meaningful weakness for a wind project. The baseline is project-based, and the record does not state when it was last reassessed, so baseline robustness is only moderate.
Transparency
Transparency is helped by the presence of a named verifier, a clear 2022 monitoring period, and matching claimed and verified ER totals in the latest record. Still, the extracted facts do not state a usage monitoring method, and the project’s public record appears internally inconsistent on ER quantities. The documentation is therefore usable but not fully clean or complete.
Claim Safety
Claim safety is moderate because this is a renewable wind project under VCS, which is generally less exposed to over-crediting than many other project types. However, the project uses a project-specific baseline, leakage is not addressed in the latest monitoring facts, and the ER totals vary materially across documents. Those issues increase the risk that the credited claim is less conservative than it should be.
Documentation
Documentation quality is fair: nineteen documents were used, extraction confidence is high, and the latest monitoring report is dated 2023-07-18. On the negative side, a corrective action explicitly notes inconsistency between the content page and the VCS monitoring report, which suggests some document-quality problems. The record also lacks several specifics, including buffer pool treatment and baseline reassessment timing.
Overall
I privileged the later 2023 validation/monitoring record over earlier 2020 monitoring and validation figures because it is more recent and appears to reflect the final verified issuance position. That said, the contradiction in ER totals is material: earlier documents show 38,098 while the later validation record shows 27,140, so confidence in the claim is reduced and the score is pulled down. I also gave more weight to the latest statement that leakage is not addressed, even though an earlier validation document described it as negligible, because the newer record is more current and specific to the monitoring period.
Audit Analysis
This is a registered VCS wind project with VVB-confirmed investment-test additionality and no material findings reported in the latest monitoring record. However, leakage is not addressed in the monitoring facts, baseline reassessment timing is not stated, and there are material discrepancies in reported ER totals across documents, which weakens confidence in the claim.
Project Description
Proponent: POWERICA LIMITED Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 24816 tCO2e Region: Asia Registration date: 2019-10-17
Red Flags
- Leakage is not addressed in the latest monitoring facts, despite an earlier document describing it as negligible.
- Reported ER totals differ across documents, with 27,140 in the later validation record versus 38,098 in earlier monitoring/validation records.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 26,434 | 26,434 | 0 | |
| 2018 | 30,334 | 29,440 | 894 | |
| 2019 | 30,642 | 30,642 | 0 | |
| 2020 | 27,747 | 2,059 | 25,688 | |
| 2021 | 28,757 | 15,001 | 13,756 | |
| 2022 | 27,140 | 0 | 27,140 | |
| Total | 171,054 | 103,576 | 67,478 |
Cosa migliorerebbe questo punteggio
- Provide a clear leakage assessment for the monitored period, including any quantified deduction or a documented justification for why leakage is negligible.
- Reconcile the conflicting ER totals across the monitoring and validation documents and publish a clear explanation of which figure is final and why.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
Avoidance project with no reversal events reported
Leakage not addressed in latest record
Project baseline, reassessment timing missing
FPIC, grievance mechanism, and safeguards noted
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →