13.75 MW Grid connected Wind Electricity generation Project by Tamilnadu Newsprints and Papers Limited
#591of 975 in India#869of 1459 in CDM (UNFCCC)#894of 1287 in ACM0002
Audit Analysis
A 13.75 MW CDM wind project in India validated by Bureau Veritas with an investment additionality test, but the validation report recorded 16 material findings spanning additionality, investment analysis, and monitoring, all of which were subsequently corrected. Two direct contradictions between the validation and monitoring reports (baseline method and leakage treatment) reduce confidence in the project's data consistency. Key quantitative fields—ERR figures, monitoring method, buffer pool, and CORSIA/CCP status—are absent from the extracted record, limiting the ability to verify claims.
Red Flags
- 16 material findings (CARs) in the validation report covering additionality, investment analysis, barrier analysis, common practice, and monitoring plan indicate the initial PDD was substantially deficient before corrections
- Contradiction between validation report (baseline = jurisdictional) and monitoring report (baseline = project) undermines confidence in the baseline methodology
- Contradiction between validation report (leakage deemed negligible) and monitoring report (leakage not addressed) leaves the 0% leakage deduction without a consistent justification
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 50,928 | 0 | 50,928 | |
| Total | 50,928 | 0 | 50,928 |
Risk Indicators
VVB-confirmed but 16 CARs in initial PDD
mixed evidence / unresolved risk
0% deduction, contradictory justification across reports
Contradiction: jurisdictional vs project-specific
Safeguards mentioned but FPIC and grievance mechanism not de
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →