Skip to main content
VCSavoidanceIndia Registry: RegisteredAMS-I.D

15 MW Grid Connected Renewable Energy Wind Turbine In Karnataka

VCS-619 ↗

#1203of 1935 in Renewable energy#629of 975 in India#825of 1339 in Verra (VCS)#389of 806 in AMS-I.D

4.8/ 10
Integrity
4.0
Transparency
5.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

A 15 MW wind project in Karnataka with VCS-registered credits (79,013 tCO2e) that passed verification despite an unusually large number of material findings and corrective actions. Additionality is confirmed via an investment test, but the non-permanence analysis is essentially blank, no buffer pool is documented, and the verification record contains multiple internal contradictions and data-quality errors that undermine confidence in the underlying calculations.

Red Flags

  • Non-permanence risk analysis lists 'NA' for risk, assessment, response, and level — no substantive permanence risk treatment for a 10-year crediting period
  • 20+ material findings in the verification report including ERR tables not summing correctly, missing B-Forms, calibration delays, and a calculation formula mismatch between the ER sheet and monitoring report
  • IRR crosses the benchmark when the plant load factor increases by 10%, indicating the additionality margin is thin and sensitive to operational assumptions
  • Baseline method is simultaneously described as 'project' and 'jurisdictional' within the same 2021 verification report
  • Leakage justification is contradictory within the same document: 'not_addressed' in one section and 'deemed_negligible' in another, with a 0% deduction

Credit Vintages

IssuedRetiredAvailable
2006
25,60725,6070
2007
34,21634,2160
2008
27,87327,8730
2009
27,28027,2800
2010
23,05923,0590
2011
29,07729,0770
2012
37,09937,0990
2013
26,52226,5220
2014
25,56925,5690
2015
24,17322,1212,052
2016
2,7492,7490
Total283,224281,1722,052

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification inconsistent

Baseline

Grid EF 2008, method contradictory

Safeguards

Grievance present, FPIC not conducted

Double-claim

CORSIA excluded, CCP not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D., Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents