15 MW Grid Connected Renewable Energy Wind Turbine In Karnataka

VCS-619 ↗

4.4 / 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.0
Documentation
4.5

Score Breakdown

Integrity

missing leakage not addressed in the latest monitoring report (monitoring report 2021-06-03)

verified additionality confirmed by the VVB (validation report 2009-11-10 / validation evidence)

Transparency

verified VVB named (TÜV NORD CERT GmbH) and monitoring period provided (2013–2019) in monitoring report

missing monitoring report and validation/issuance contain contradictory emission reduction totals (79,013 vs 89,235), reducing data reliability

Claim Safety

missing baseline emission factor is old (grid EF year 2008) and baseline not reassessed in available records

inferred project is not CORSIA-eligible (monitoring report) which lowers double-claim risk, but CCP status is not stated

Documentation

verified 17 documents extracted and a 2021 monitoring report and 2021 issuance exist (recent evidence available)

missing multiple corrective actions remain (CAR 02–CAR 07) requesting missing PPA, commissioning certificate, calibration records, and monitoring breakdowns

Detailed Analysis

Integrity

Additionality is presented and was confirmed by the VVB (validation evidence). The project uses a project-specific baseline under AMS I.D (methodology Version 13), but the baseline was not reassessed in the record. No buffer pool percentage or reversal events are documented in available files, and leakage is explicitly 'not addressed' in the latest monitoring report (2021-06-03). The absence of leakage treatment and missing reversal/ buffer information, combined with multiple corrective action requests for core monitoring evidence, lowers the integrity score.

Transparency

A named VVB (TÜV NORD CERT GmbH), a clear monitoring period (2013-01-01 — 2019-05-31), and issuance documents are present. Extraction confidence is high and 17 documents were used. However, key data are inconsistent: emitted reductions are reported as 89,235 in earlier validation documents and 79,013 in later issuance/monitoring, and several monitoring details are missing per corrective actions, reducing transparency and traceability.

Claim Safety

The project is reported as not CORSIA-eligible (monitoring report) which reduces double-claim risk, but CCP status is not stated. The grid emission factor used is from 2008 and the baseline has not been reassessed, increasing over-crediting risk. Contradictory ERR figures (89,235 vs 79,013) further raise concern about accurate crediting.

Documentation

Documentation coverage is mixed: evidence includes PDD, validation, monitoring report, and issuance with high extraction confidence and recent dates (monitoring report 2021, issuance 2021). Nevertheless, many corrective action requests remain open (CAR 02–CAR 07) asking for missing PPA, O&M agreement, commissioning certificate, declaration on double counting, calibration certificates, and detailed monitoring breakdowns, indicating important gaps.

Overall

I privileged the more recent monitoring report (2021-06-03) and issuance (2021-07-22) over older validation records (2013 and 2009) when resolving contradictions because later documents should reflect resolved issues and final issuance. Specifically, for emission reductions I used the issuance/monitoring value of 79,013 (issuance 2021-07-22 and monitoring report 2021-06-03) rather than the earlier 89,235 from 2013 validation. For social/safeguard items (grievance mechanism, FPIC, safeguards mentioned, benefit sharing), the 2021 monitoring report indicates presence whereas 2013 documents indicated absence; I privileged 2021 but downgraded scores because these are contradictory and the monitoring report still flags many missing supporting documents (CARs). These contradictions reduce confidence in reported figures and required lowering scores for integrity, transparency, and claim safety.

Audit Analysis

The project has some verified additionality and a named VVB, but multiple corrective action requests, missing leakage treatment, and contradictions in reported emission reductions reduce confidence. Documentation exists across many documents, but key supporting evidence (PPA, commissioning certificate, leakage justification, buffer) is missing or inconsistent.

Project Description

This project involves installing Wind Electric Generators (WEGs) in the Chitradurga district of Karnataka to generate 15 MW of electricity from wind resources. By displacing electricity generated from thermal energy resources, the project helps reduce carbon emissions. The electricity generated by the 20 WEGs will be fed into the regional grid through existing infrastructure.

Red Flags

  • Contradictory total emission reduction figures: 89,235 vs 79,013 across documents
  • Leakage not addressed in latest monitoring report and no buffer/reversal provisions documented
  • Numerous corrective action requests requiring missing core documents (PPA, commissioning certificate, calibration records)

Credit Vintages

Issued Retired Available
2006
25,607 25,607 0
2007
34,216 34,216 0
2008
27,873 27,873 0
2009
27,280 27,280 0
2010
23,059 23,059 0
2011
29,077 29,077 0
2012
37,099 37,099 0
2013
26,522 26,522 0
2014
25,569 25,569 0
2015
24,173 22,121 2,052
2016
2,749 2,749 0
Total 283,224 281,172 2,052

Cosa migliorerebbe questo punteggio

  • Provide the missing supporting documents requested in CAR 02–CAR 07 (PPA, commissioning certificate, O&M, calibration certificates, monitoring breakdown) and demonstrate closure of CARs in a follow-up verification.
  • Publish a clear leakage assessment or apply a quantified leakage deduction and document buffer/reversal provisions; reassess the baseline or justify continued use of the 2008 grid EF with supporting analysis.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

additionality present but inconsistent

Permanence

no buffer/reversal info

Leakage

leakage not addressed

Baseline

project baseline, not reassessed

Safeguards

FPIC/grievance claimed but documentation inconsistent

Double-claim

CORSIA no, CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti