1500 MW Large Scale Nathpa Jhakri Hydroelectric Station by SJVN Limited (HCPL CREDUCE JV)
#484of 770 in Renewable energy#3of 13 in Himachal Pradesh India#42of 421 in Universal Carbon Registry (UCR)#331of 383 in ACM0002
Audit Analysis
The Nathpa Jhakri 1500 MW hydroelectric project is a large-scale, government-backed renewable energy installation with inherently strong additionality and minimal permanence risk, but the available record consists solely of a Project Design Document with no verification report, monitoring report, or VVB identification. The absence of verified emissions reductions data, a named verification body, and a documented additionality test creates significant evidence gaps that limit confidence in the claimed 5.95 million tCO2e over the 2014–2021 crediting period.
Red Flags
- No verification body (VVB) is identified in the available record, and no verification or monitoring report was found among the extracted documents
- Additionality test type and VVB confirmation are not stated in the PDD, leaving the additionality claim undocumented
- Total verified ERR is not available, so the claimed 5,950,800 tCO2e cannot be cross-checked against actual monitoring data
- The PDD is dated 2022-03-07, which post-dates the end of the crediting period (2021-12-31), raising questions about the registration timeline
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test not documented in available records
Physical infrastructure, minimal reversal risk
Negligible, justified for hydro displacement
Jurisdictional but reassessment timing unknown
Partially documented; FPIC and grievance mechanism not state
CORSIA and CCP status not stated in available records
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →