60 MW solar Power plant in Karnataka M/s Asian Feb Tec Limited.
#702of 770 in Renewable energy#15of 17 in Karnataka India#350of 421 in Universal Carbon Registry (UCR)#377of 383 in ACM0002
Audit Analysis
A 60 MW solar PV project in Karnataka registered under the UCR using the well-established ACM0002 methodology, with a jurisdictional baseline and a reasonable grid emission factor of 0.9 tCO₂/MWh. However, the extracted record contains only the PDD — no verification report, monitoring report, or VVB documentation was available, leaving additionality, ERR performance, and safeguards largely unverified. The project is inherently low-risk in terms of permanence (solar PV has no biogenic reversal risk), but the documentation gap significantly limits confidence in the credit's integrity and transparency.
Red Flags
- No verification report, monitoring report, or VVB report was found in the extracted record — only the PDD (dated 2024-05-07) is available, making it impossible to confirm additionality, verify ERR figures, or assess MRV quality.
- Additionality test type and VVB confirmation are not stated in the available documents, leaving a critical integrity gap for a project whose crediting period began in 2018.
- No ERR figures (claimed or verified) were found, preventing any assessment of over- or under-crediting against the pro-rata expectation for the 2018–2023 monitoring period.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type not stated; VVB confirmation not found
Solar PV — no biogenic reversal risk; no reversal events rep
0% deduction, deemed negligible — reasonable for grid-connec
Jurisdictional baseline stated; last reassessment date not f
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.