Skip to main content
UCRBrazilACM0002

Neutral Carbon by AXS – 35.5 MW Decentralized Solar Power Projects in Brazil

UCR-572 ↗

#448of 770 in Renewable energy#76of 104 in Brazil#11of 421 in Universal Carbon Registry (UCR)#323of 383 in ACM0002

4.3/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 35.5 MW solar project in Brazil using a jurisdictional baseline and ACM0002 methodology, with no material findings or corrective actions. However, the available record consists solely of the PDD — no verification report, monitoring report, or VVB identification is present, and additionality testing, FPIC, and grievance mechanisms are not documented. The project's fundamental design is sound, but the evidence base is too thin to confirm robust implementation.

Red Flags

  • No verification report or monitoring report is available; the entire record rests on a single PDD document
  • Additionality test type and VVB verification are not stated in the extracted record, leaving the core additionality claim unconfirmed
  • FPIC was not conducted and no grievance mechanism is documented, despite safeguards being mentioned
  • No VVB is identified by name, making independent verification status unverifiable

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not stated in available documents

Permanence

Solar avoidance; no reversal risk

Leakage

0% deemed negligible; appropriate for solar

Baseline

Jurisdictional baseline, 2024 grid EF

Safeguards

Mentioned but FPIC not conducted; no grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-20ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents