Audit Analysis

This 135 MW solar project in Karnataka uses a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of a PDD with no verification report, monitoring report, or VVB documentation. Additionality, permanence safeguards, and verified emission reduction figures are entirely absent from the extracted data, making it impossible to confirm the project's core claims.

Red Flags

  • No additionality test type or VVB verification found in any available document — a fundamental requirement for ACM0002 is unconfirmed
  • No verification report, monitoring report, or VVB report in the evidence set; only a single PDD (dated 2024-05-08) is available
  • No verified or claimed emission reduction figures present, preventing any assessment of over- or under-crediting
  • No buffer pool percentage or permanence risk mitigation documented despite a 10-year crediting period

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

No additionality test or VVB verification found

Permanence

No buffer pool or reversal data documented

Leakage

0% deemed negligible — appropriate for solar

Baseline

Jurisdictional method stated; reassessment date not found

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents