42.5 MW Wind Power Project by BPCL in Karnataka
#698of 770 in Renewable energy#14of 17 in Karnataka India#346of 421 in Universal Carbon Registry (UCR)#375of 383 in ACM0002
Audit Analysis
This 42.5 MW wind project in Karnataka claims 770,665 tCO2e over an 8-year crediting period under the UCR registry, but the evidence base is critically thin: only a single PDD (dated 2024, after the crediting period ended) is available, no verification body is identified, no verified ERR figure exists, and no additionality test is documented. The claimed reductions are arithmetically plausible for the installed capacity, but without independent verification the project cannot be considered credibly quantified.
Red Flags
- PDD is dated 2024-09-05, which is after the crediting period ended (2023-12-31), suggesting retroactive or post-hoc documentation rather than a forward-looking project design
- No verification body (VVB) is identified in any available document, and no verified ERR figure exists — the 770,665 tCO2e claim is entirely unverified
- No additionality test type or VVB confirmation of additionality is documented, a fundamental requirement for any carbon credit project
- Only one document (the PDD) forms the entire evidence base; no verification report, monitoring report, or VVB audit is available
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
No additionality test documented
No buffer pool; low inherent risk for wind
0% deduction, thin justification
Jurisdictional method stated; no reassessment date
Mentioned but FPIC and grievance mechanism absent
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →