Skip to main content
UCRKarnataka IndiaACM0002

49.3 MW Wind Power Project by BPCL in Karnataka

UCR-465 ↗

#462of 770 in Renewable energy#2of 17 in Karnataka India#24of 421 in Universal Carbon Registry (UCR)#324of 383 in ACM0002

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.0

Audit Analysis

A 49.3 MW wind power project in Karnataka using a jurisdictional baseline and ACM0002 methodology, with a claimed lifetime ERR of approximately 1.31 million tCO2e over a ~9.6-year crediting period. The project shows no material findings or corrective actions, but the available record is limited to a single PDD with no verification or monitoring reports, leaving additionality verification, VVB identity, and verified emissions reductions unconfirmed.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the available record, leaving the core additionality claim unverified
  • No verification report or monitoring report is present in the extracted documents; only the PDD is available
  • Grid emission factor of 0.9 tCO2/MWh is drawn from a single year (2013) with no indication of periodic updating
  • VVB name is not stated, making independent verification status unverifiable

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available recor

Permanence

Wind avoidance project; no reversal events reported

Leakage

0% deduction, deemed negligible — consistent with wind

Baseline

Jurisdictional method; grid EF from single year (2013); reas

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status both not stated in available record

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents