Skip to main content
UCRMaharashtra Madhya Pradesh Tamil Nadu Punjab Odisha Telangana Gujarat and West BengalACM0002

36.67 MW Bundled Solar Power Project by Fourth Partner Energy Private Limited, (FPEPL).

UCR-462 ↗

#474of 770 in Renewable energy#33of 421 in Universal Carbon Registry (UCR)#329of 383 in ACM0002

4.1/ 10
Integrity
4.0
Transparency
3.5
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 36.67 MW bundled solar PV project under the UCR registry using the well-established ACM0002 methodology with a jurisdictional baseline. The project design is sound for its sector, but the available evidence is limited to a single PDD with no verification report, monitoring report, or identified VVB, leaving additionality confirmation and actual generation unverified.

Red Flags

  • No verification body (VVB) is identified in the available record, and additionality verification status is not stated
  • Only a single PDD document is available; no verification report or monitoring report was found to confirm actual generation or validate the 21,057 tCO₂e claim
  • Grid emission factor is from 2013 (0.9 tCO₂/MWh) with no stated reassessment date, raising questions about baseline currency

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB verification not stated in available recor

Permanence

No buffer pool specified; solar PV has lower but non-zero re

Leakage

0% deduction, deemed negligible—appropriate for solar PV

Baseline

Jurisdictional method appropriate, but grid EF from 2013 and

Safeguards

Safeguards mentioned and benefit sharing described, but FPIC

Double-claim

CORSIA eligibility and CCP status both not stated in availab

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents