2.1 MW Wind Power Project by SVPL
#546of 770 in Renewable energy#16of 42 in Gujarat India#122of 421 in Universal Carbon Registry (UCR)#251of 417 in AMS-I.D
Audit Analysis
A 2.1 MW wind project in Gujarat registered under the UCR standard with a jurisdictional baseline and a reasonable 0% leakage assumption, but the available record consists of only a single PDD with no verification report, no monitoring data, and no identified verification body. The claimed 4,139 tCO₂e over a 9.5-year crediting period appears to represent roughly one year of generation at a 25% capacity factor, raising questions about whether the figure is annual or lifetime. The project is inherently low-risk in design but is severely under-documented for independent assessment.
Red Flags
- Only one document (the PDD) is available; no verification report, monitoring report, or VVB report was found in the extracted record
- No verification body is identified and no verified ERR figure exists, making independent confirmation of the 4,139 tCO₂e claim impossible
- The claimed total of 4,139 tCO₂e over a 9.5-year crediting period is arithmetically consistent with only ~1 year of output at a 25% capacity factor for a 2.1 MW turbine, suggesting the figure may be annual rather than lifetime or that the capacity factor assumption is unusually low
- Additionality test type and VVB confirmation are not stated in the available record
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test in PDD but VVB confirmation not stated
No buffer pool or reversal data; wind risk moderate
0% deemed negligible — appropriate for grid wind
Jurisdictional method sound; reassessment date not stated
Mentioned in PDD; FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →