2.5 MW BEL grid-connected wind power project at Davanagere district, Karnataka, India

CDM-1216 ↗

5.3 / 10
Integrity
6.1
Transparency
4.8
Claim Safety
5.2
Documentation
4.3

Score Breakdown

Integrity

verified The VVB, TÜV NORD CERT GmbH, confirmed additionality, and the validation record reports no material findings or corrective actions.

missing Leakage justification is not addressed in the validation record, and reversal events are not addressed.

Transparency

verified The project has named validation and monitoring documentation, with a defined monitoring period from 2009-04-01 to 2012-03-31.

missing Claimed versus verified emission reductions are not available in the extracted record, and key MRV items such as usage monitoring and FNRB inputs are not stated.

Claim Safety

verified The project uses ACM0002 for a grid-connected wind project, and the grid emission factor is stated as 0.9323.

missing Leakage is inconsistently documented, and there is no evidence in the extracted record for CORSIA or CCP status to reduce dual-claim uncertainty.

Documentation

verified Multiple official document types were used, including validation, PDD, and monitoring materials, and the VVB is identified.

missing Extraction confidence is low, several fields are not stated, and the record contains contradictions on additionality, leakage, and the crediting period.

Detailed Analysis

Integrity

The validation report by TÜV NORD CERT GmbH confirms additionality, and the extracted record shows no material findings or corrective actions required. That said, leakage justification is not addressed in the validation record, reversal events are not addressed, and the project is a wind power project where permanence risk is low but still not explicitly discussed in the available documents.

Transparency

The project has a defined monitoring period and identifiable documentation, but the extracted record does not provide claimed versus verified emission reductions. Several MRV elements are not stated, including usage monitoring, FNRB inputs, and the year for the grid emission factor, which limits public traceability and auditability.

Claim Safety

Claim safety is moderate because the project is a grid-connected wind CDM activity using ACM0002 and a stated grid emission factor, which is generally straightforward. However, leakage treatment is inconsistent across documents, and CORSIA eligibility and CCP status are not stated, so dual-claim and over-crediting risk cannot be ruled out from the extracted record.

Documentation

Documentation is weakened by low extraction confidence and by the presence of multiple missing fields in the extracted record. The evidence set includes validation, PDD, monitoring, and an additional appendix, but contradictions remain on the additionality test, leakage treatment, and crediting period, which reduces reliability.

Overall

The project looks reasonably strong on core CDM validation because additionality was confirmed by the VVB and no material findings were reported. However, the record contains contradictions: the additionality test is described as combined in the validation report but barrier-based in the PDD, leakage is described as not addressed in one source but quantified in another later source, and the crediting period differs between documents; I privileged the validation report for these items because it is the higher-priority assurance document and is dated earlier, but the inconsistencies still reduce confidence. Because documentation quality is limited and several key MRV and claim-safety fields are missing, the overall score remains moderate rather than strong.

Audit Analysis

This is a CDM wind project with VVB-confirmed additionality and no material findings reported, which supports a moderate integrity score. However, key MRV details are missing or inconsistent, and the record shows low extraction confidence plus contradictions on additionality, leakage treatment, and crediting period, which weakens transparency and claim safety.

Project Description

Status: Registered Type: PA Methodology: AMS-I.D. Project type: Wind Sub-type: Wind Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 5.36 ktCO2e/yr

Red Flags

  • Leakage treatment is inconsistent: one document says it was not addressed, while another later source indicates it was quantified.
  • The crediting period and additionality test differ across documents, creating reliability concerns in the project record.

Credit Vintages

Issued Retired Available
2011
4,852 0 4,852
2013
11,004 0 11,004
Total 15,856 0 15,856

Cosa migliorerebbe questo punteggio

  • Provide a complete, reconciled MRV package showing verified emissions, leakage treatment, and the basis for any deductions.
  • Resolve document contradictions by publishing the authoritative crediting period, additionality test basis, and a clear explanation of which source controls each value.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed additionality

Permanence

Wind project, no reversal events reported

Leakage

Leakage treatment inconsistent

Baseline

Project baseline stated, reassessment not found

Safeguards

FPIC noted, grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-13 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti