Skip to main content
UCRUna District Himachal Pradesh IndiaAMS-I.D

2 MW Bundled Solar Power Project in Himachal Pradesh, India

UCR-81 ↗

#453of 770 in Renewable energy#15of 421 in Universal Carbon Registry (UCR)#163of 416 in AMS-I.D

4.2/ 10
Integrity
4.5
Transparency
3.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

A small 2 MW grid-connected solar project under the UCR registry with a jurisdictional baseline and reasonable 0% leakage treatment, but the available record consists solely of a PDD with no verification report, monitoring report, or ERR figures. Additionality assessment, VVB identity, and all credit-quantity data are absent from the extracted record, limiting confidence in the project's compliance and delivery.

Red Flags

  • No additionality test type or VVB verification of additionality is stated in the available PDD extraction
  • Grid emission factor of 0.9 tCO2/MWh is sourced from 2014 data, over 7 years before the PDD date (January 2022), raising concerns about baseline currency
  • No ERR figures (claimed or verified) are present in the record, making over- or under-crediting unverifiable
  • No VVB is identified and no verification or monitoring report is included in the evidence set

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test not stated in available record

Permanence

Avoidance project – no reversal risk

Leakage

0% deemed negligible – appropriate for solar

Baseline

Jurisdictional but grid EF from 2014

Safeguards

FPIC, safeguards, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents