Skip to main content
UCRHimachal Pradesh IndiaAMS-I.D

5 MW Small Scale Balsio Small Hydroelectric Project of Ginni Global Pvt. Ltd.

UCR-112 ↗

#516of 770 in Renewable energy#5of 13 in Himachal Pradesh India#82of 421 in Universal Carbon Registry (UCR)#218of 417 in AMS-I.D

3.8/ 10
Integrity
3.5
Transparency
3.0
Claim Safety
5.5
Documentation
3.0

Audit Analysis

A 5 MW small hydro project in Himachal Pradesh registered under UCR with a jurisdictional baseline and a reasonable 0% leakage deduction, but the available record consists solely of a PDD with no verification report, no monitoring data, and no identified VVB. The absence of a stated additionality test and any ERR figures makes it impossible to confirm that the project's carbon claims are independently validated and properly quantified.

Red Flags

  • Additionality test type and VVB verification are not stated in the available PDD — a critical gap for a small hydro project where investment additionality is the primary integrity question
  • No verification report, monitoring report, or VVB name found in the extracted record; only a single PDD (dated 2022-03-02) is available
  • No ERR figures (claimed or verified) are present, preventing any assessment of over- or under-crediting
  • No buffer pool or permanence risk mitigation mechanism is stated for a project with inherent hydrological and infrastructure reversal risk

Credit Vintages

Issuance data not yet available — check back soon.

Risk Indicators

Additionality

Test type and VVB confirmation not stated in available PDD

Permanence

No buffer pool or reversal-risk mitigation stated; no revers

Leakage

0% deduction deemed negligible — appropriate for grid-displa

Baseline

Jurisdictional method stated; last reassessment date not fou

Safeguards

FPIC conducted and safeguards mentioned; grievance mechanism

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-19AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents