2014-P5
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the verification record reports no material findings or corrective actions.
missing Baseline method, leakage treatment, and buffer pool coverage are not stated in the available documents.
Transparency
verified The monitoring period and crediting period are clearly stated, giving at least basic temporal traceability.
missing The extracted record does not identify the VVB, and total ERR claimed versus verified is not available.
Claim Safety
verified The project uses an ACR ozone-depleting substances methodology, which is generally more structured than ad hoc crediting approaches.
missing No leakage deduction, usage-rate evidence, or CORSIA/CCP status is stated, so over-crediting and market-claim risk remain unresolved.
Documentation
verified Two documents were used and the extraction confidence is medium rather than low.
missing The evidence set is sparse, with the key source listed as unknown and several core fields not found in the extracted record.
Detailed Analysis
Integrity
The verification record supports the project on additionality because it says additionality was confirmed by the VVB, and it reports no material findings or corrective actions. That said, the baseline method is not stated, and leakage, buffer pool, and reversal information are also not found in the extracted record, so the integrity case is only moderate.
Transparency
The monitoring period and crediting period are clearly identified, which helps traceability. But the VVB name is not found, and the record does not provide total ERR claimed versus verified, so public-facing MRV completeness is weak.
Claim Safety
Claim safety is constrained by missing evidence on leakage treatment, permanence protections, and usage-rate monitoring. The methodology is named, but without stated leakage deductions, CORSIA eligibility, or CCP status, the risk of over-crediting or overstated climate claims remains material.
Documentation
Documentation quality is limited because the extracted evidence set is sparse and one source is listed as unknown. The extraction confidence is medium, which is better than low, but many core fields are still not found, reducing confidence in the completeness of the record.
Overall
The project shows some positive integrity signals, especially VVB-confirmed additionality and no reported findings. However, the record leaves major gaps on baseline, leakage, permanence, and registry-claim eligibility, which depresses both transparency and claim safety. There are no contradictions to resolve in the extracted facts, so the score is driven mainly by missing documentation rather than conflicting evidence.
Audit Analysis
This ACR ozone-depleting substances project has some integrity support because additionality was confirmed by the VVB and no material findings or corrective actions were reported. However, key baseline, leakage, permanence, and registry-eligibility details are not stated in the extracted record, which limits confidence and raises claim-safety concerns.
Project Description
Status: N/A Project type: Ozone Depleting Substances Methodology: ARB Compliance Offset Protocol: Destruction of U.S. Ozone Depleting Substances Banks Developer: EOS Climate Inc Location: El Dorado SDGs: 09: Industry, Innovation and Infrastructure;12: Responsible Consumption and Production;13: Climate Action
Red Flags
- Baseline method is not stated in the available documents, so the baseline validity cannot be checked.
- Leakage treatment, buffer pool coverage, and reversal information are not stated, leaving permanence and over-crediting risk partly unresolved.
Credit Vintages
Nessuna emissione registrata sul registro.
Cosa migliorerebbe questo punteggio
- Provide the full verification and monitoring reports showing the baseline method, leakage treatment, and any buffer or reversal provisions.
- Disclose registry and market-eligibility status, including CORSIA and CCP information, plus the VVB name and any quantified ERR reconciliation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
No buffer or reversal data stated
Leakage treatment not stated
Baseline method not stated
Safeguards not documented
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →