228 MW Bundled Wind Projects in Rajasthan, Madhya Pradesh and Maharashtra, India by LGEPL
#491of 770 in Renewable energy#47of 421 in Universal Carbon Registry (UCR)#334of 383 in ACM0002
Audit Analysis
A 228 MW bundled wind project under the UCR registry with a jurisdictional baseline and no adverse findings, but critical verification details (VVB identity, additionality test, verified emissions reductions) are absent from the available record. Only a single PDD document is on file, making independent cross-checking of the claimed 276,302 tCO₂e impossible. The project's wind-energy nature limits permanence and leakage risk, but the thin evidentiary base constrains confidence in the overall claim.
Red Flags
- No verification body (VVB) is identified in the available record, and no verification or monitoring report was found — the claimed 276,302 tCO₂e cannot be independently corroborated.
- Additionality test type and VVB confirmation are not stated in the PDD, leaving the additionality claim unverified.
- Only one document (the PDD, dated 2024-03-07) is available for a project whose crediting period ran from 2013 to 2023, creating a significant evidentiary gap.
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB confirmation not stated
Wind avoidance project; no reversal risk inherent
0% deemed negligible; consistent with wind
Jurisdictional method stated; reassessment date not found
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →