250 kW Ground Mounted Solar Power Project By M/s Tara Solar Power PV Plant
#643of 770 in Renewable energy#13of 13 in Himachal Pradesh India#268of 421 in Universal Carbon Registry (UCR)#336of 417 in AMS-I.D
Audit Analysis
A small 250 kW solar PV project in Himachal Pradesh using a standardized methodology (AMS-I.D.) with a jurisdictional baseline, but the available record consists solely of a PDD with no verification, monitoring, or VVB documentation. Additionality is not confirmed by any independent body, and no emission reduction figures (claimed or verified) are available to assess over-crediting risk. The project's inherent low permanence risk and reasonable leakage treatment are positive, but the documentation gap is severe.
Red Flags
- No VVB identified and no additionality test type or verification recorded in the available PDD
- No emission reduction figures (claimed or verified) available in any document — over-crediting risk cannot be assessed
- Only a single PDD document is on file; no verification report, monitoring report, or VVB audit report exists in the record
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unaddressed
Credit Vintages
Issuance data not yet available — check back soon.
Risk Indicators
Test type and VVB verification not stated in PDD
Solar PV asset — inherently low reversal risk
0% deduction, deemed negligible — reasonable for grid-displa
Jurisdictional grid EF 0.9 tCO₂/MWh, standardized methodolog
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both unstated — dual-channel risk unad
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →