3 MW wind farm project for Gupta Coalfields & Washeries Limited
#166of 1935 in Renewable energy#78of 975 in India#99of 1459 in CDM (UNFCCC)#57of 806 in AMS-I.D
Audit Analysis
A straightforward 3 MW wind farm in India with a jurisdictional grid baseline and VVB-confirmed investment additionality test. The project delivered roughly 86% of its claimed emissions reductions in the first monitoring period, consistent with pro-rata expectations. However, the PDD carried 16 material findings (all resolved) touching on emission-factor selection, sensitivity analysis, and tax computation, and safeguards documentation is thin.
Red Flags
- 16 material findings (CARs) in the PDD covered emission-factor selection, sensitivity-analysis conformity, tax computation, and PLF conformity — all resolved but indicating a PDD that required substantial methodological correction before approval
- Free, prior and informed consultation (FPIC) and a formal grievance mechanism are not documented in the extracted record, despite safeguards being mentioned in general terms
- The grid emission factor of 0.92695 tCO₂/MWh is sourced from 2008 data; no evidence of a more recent or generation-weighted EF update was found in the available documents
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 9,473 | 0 | 9,473 | |
| Total | 9,473 | 0 | 9,473 |
Risk Indicators
VVB-confirmed investment test
Physical wind asset, no reversal risk
0% deduction, negligible for wind
Jurisdictional grid EF, standard method
Mentioned but FPIC/grievance not documented
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →