3A BES Akyurt Biogas Power Plant
#21of 111 in Biogas#59of 121 in Turkey#262of 629 in Verra (VCS)#4of 11 in AM0073
Audit Analysis
The 3A BES Akyurt Biogas Power Plant is a VCS-registered biogas project in Turkey with VVB-confirmed additionality (investment test) and documented safeguards including FPIC and a grievance mechanism. However, the absence of monitoring-period data, unknown CORSIA/CCP status, a project-specific baseline, and low extraction confidence across the document set limit confidence in the project's ongoing performance and claim integrity.
Red Flags
- No monitoring period or verified performance data found in the extracted record; the verified ERR figure is identical to the ex-ante claim (717,156 tCO₂e), suggesting no independent monitoring-period verification is available
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel or double-claiming risk unassessed
- Low extraction confidence across the document set indicates at least one key document was poorly readable, reducing reliability of the extracted facts
- Twenty material findings were raised during validation (resolved), indicating the initial PDD had significant technical gaps in emission calculations, baseline documentation, and monitoring plan
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Non-AFOLU biogas; no carbon storage
Quantified as negligible; consistent with project type
Project-specific; not yet due for reassessment
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →