DENIZLI ENERGY BIOGAS PLANT
#30of 111 in Biogas#77of 121 in Turkey#340of 629 in Verra (VCS)#14of 62 in AMS-III.D
Audit Analysis
The Denizli Energy Biogas Plant is a VCS-registered biogas project with VVB-confirmed additionality and matching claimed/verified ERR figures for the monitoring period, but it is undermined by eight material findings (including baseline equation inconsistencies and incomplete additionality justification), a weak 0% leakage treatment for a methane-based project, and five cross-document contradictions on key attributes such as FPIC status, baseline type, and benefit sharing. The project delivered only about 20% of the pro-rata ex-ante expectation for the elapsed period, which eliminates over-crediting risk but raises questions about the robustness of the original baseline projections.
Red Flags
- Eight material findings in the verification report, including baseline determination equations inconsistent with the stated methodology versions and an incomplete additionality justification missing specific references to CDM tools
- Zero percent leakage deduction justified only as 'deemed negligible' in a biogas project where methane slip is a well-known emission pathway; the validation report did not even address leakage
- Five contradictions between the PDD, validation report, and monitoring report on FPIC status, baseline type (measured vs. modeled), benefit sharing, and leakage treatment, indicating inconsistent project documentation
- No buffer pool percentage or reversal-event history found in any available document, leaving permanence risk unquantified for a methane-based project
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 4,000 | 0 | 4,000 | |
| Total | 4,000 | 0 | 4,000 |
Risk Indicators
VVB-confirmed combined test
No buffer pool or reversal data found
0% deduction, 'deemed negligible' only
Project-specific; measured vs. modeled contradiction
Grievance present; FPIC and benefit-sharing contradicted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →