Audit Analysis

The Çubuk Biogas Power Plant is a VCS-registered waste-to-energy project with a solid additionality case (combined investment and common-practice test confirmed by the VVB, IRR well below the 20% benchmark) and a defensible zero-leakage justification. However, the absence of any verified monitoring data, a project-specific modeled baseline, no buffer pool, and low document extraction confidence limit confidence in the credit claims. The project is in its early crediting period (2020–2027) and has not yet produced verifiable performance data.

Red Flags

  • No verified ERR or monitoring period data found in any available document — the project's actual performance is unconfirmed
  • Reversal events explicitly 'not addressed' and no buffer pool percentage stated, leaving permanence risk unquantified
  • FPIC status contradicts between two PDD versions (2022 says conducted, 2025 says not conducted)
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test, IRR 6.6% < 20% benchmark

Permanence

No buffer pool, reversal not addressed (lower risk for waste

Leakage

Zero deduction, quantified boundary justification

Baseline

Project-specific modeled baseline, no reassessment yet due

Safeguards

Grievance mechanism present, FPIC status contradictory

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AM0073

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents