Akalan Biogas Energy Power Plant
#53of 111 in Biogas#101of 121 in Turkey#450of 629 in Verra (VCS)#6of 11 in AM0073
Audit Analysis
The Akalan Biogas Energy Power Plant is a VCS-registered biogas project in Turkey with a confirmed investment additionality test and FPIC, but it relies on a project-specific modeled baseline, applies a 0% leakage deduction, and lacks a buffer pool, LCA, and feedstock sustainability documentation. The identical claimed and verified ERR figures (736,530) appear to reflect the ex-ante validation estimate rather than independent monitoring results, and the low extraction confidence across nine source documents limits assurance on data completeness.
Red Flags
- Total ERR claimed and verified are identical (736,530), suggesting the 'verified' figure is the ex-ante PDD estimate rather than an independent monitoring-period result; no monitoring period is stated in the extracted record.
- Leakage deduction is 0% despite the project involving poultry farm feedstock; the PDD characterises leakage as 'deemed negligible' while the later validation report calls it 'quantified' — the basis for a zero deduction is not clearly documented.
- No buffer pool percentage is stated in any available document, leaving permanence risk unquantified for a project whose crediting period runs to April 2029.
- Feedstock sustainability, carbon content testing, and LCA are all absent from the extracted record, creating gaps in the environmental integrity chain for a biogas project.
- Minimum extraction confidence is rated low, and one of the nine source documents is classified as 'unknown' type, reducing assurance on the completeness of the evidence base.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
No buffer pool stated; not AFOLU
0% deduction; justification inconsistent across docs
Project-specific modeled baseline
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →